Overview

The objective of this workshop is to develop and incorporate safety requirements into trials planning, as part of the activity to realise evidence for the safety case.  In addition, to consider the safety of the trials themselves and the role of safety in trials development

Task

Developing the ITEAP

Update the table below for each SRD requirement selected, using the dropdown box, to identify:

  • How the requirement will be verified (design, test, calculation, inspection, etc).
  • Detail how the verification will be undertaken (e.g. a test plan).
  • Define the acceptance (pass/fail) criteria.
  • State when in the CADMID cycle the verification will be undertaken (this could happen at several stages, depending on the test).
  • Identify if a SCR is required to support the verification assessment.
wdt_ID SRD Requirement Verification Strategy Verification Details (Specific details of the test, etc) Acceptance Criteria Stage of CADMID SCR needed to conduct verification
202

Trials – Hazard Identification

Before trails are undertaken, it may be necessary to undertake hazard identification and assessment to ensure the trials can be conducted safely. Consider your SRD requirements above and those associated with the pressure requirements of the OIL SSTS, or an element of. Develop your Test Plan in the table above to with sufficient detail to allow the team to undertake a hazard assessment of the proposed test, using the ASEMS hazard checklist guidewords and the table below to capture your output.