| wdt_ID | ID | System Function / Component | Hazard Title / Description | Prelim - Accident Sequence | Required Controls / Mitigation |
|---|---|---|---|---|---|
| 458 | |||||
| 466 | 4 | Burn gas | Noise exposure | C: High pressure gas flow and combustion H: Noise exposure A: Hearing loss/ damage | PPE for staff |
| 467 | 5 | Burn gas | Heat from stack | C: Uncontrolled burn from gas release, H: Heat from stack, A: Risk of burns to staff, loss of structural integrity | Routine maintenance, inspections, shut off valves |
| 469 | 7 | Burn Gas | Smoke inhalation | C: Incorrect mix of gas H: Smoke inhalation A: Harm to personnel | Monitoring equipment |
- Home
- Workshops
- Scenario
- Team A
- Team A – Safety Management Plan
- Team A – Preliminary Hazard Identification
- Team A – User Requirements Document
- Team A – Legislation Database
- Team A – SCR for Initial Gate
- Team A – System Requirements Document
- Team A – Oil SSTS ITEAP
- Team A – Safety Analysis of Options
- Team A – ALARP Assessment
- Team A – Safety Case Report – Main Gate
- Team A – Contracting for Safety
- Team A – Safe by Design (PDR/CDR)
- Team A – Audit
- Team A – Safety Case Report – In-Service
- Team A – Oil SSTS UOR
- Team A – Culture Assessment
- Team A – Maintaining ALARP In-service
- Team A – Oil SSTS Disposal
- Team B
- Team B – Safety Management Plan
- Team B – Preliminary Hazard Identification
- Team B – User Requirements Document
- Team B – Legislation Database
- Team B – SCR for Initial Gate
- Team B – System Requirements Document
- Team B – Oil SSTS ITEAP
- Team B – Safety Analysis of Options
- Team B – ALARP Assessment
- Team B – Safety Case Report – Main Gate
- Team B – Contracting for Safety
- Team B – Safe by Design (PDR/CDR)
- Team B – Audit
- Team B – Safety Case Report – In-Service
- Team B – Oil SSTS UOR
- Team B – Culture Assessment
- Team B – Maintaining ALARP In-service
- Team B – Oil SSTS Disposal
- Team C
- Team C – Safety Management Plan
- Team C – Preliminary Hazard Identification
- Team C – User Requirements Document
- Team C – Legislation Database
- Team C – SCR for Initial Gate
- Team C – System Requirements Document
- Team C – Oil SSTS ITEAP
- Team C – Safety Analysis of Options
- Team C – ALARP Assessment
- Team C – Safety Case Report – Main Gate
- Team C – Contracting for Safety
- Team C – Safe by Design (PDR/CDR)
- Team C – Audit
- Team C – Safety Case Report – In-Service
- Team C – Oil SSTS UOR
- Team C – Culture Assessment
- Team C – Maintaining ALARP In-service
- Team C – Oil SSTS Disposal
- Team D
- Team D – Safety Management Plan
- Team D – Preliminary Hazard Identification
- Team D – User Requirements Document
- Team D – Legislation Database
- Team D – SCR for Initial Gate
- Team D – System Requirements Document
- Team D – Oil SSTS ITEAP
- Team D – Safety Analysis of Options
- Team D – ALARP Assessment
- Team D – Safety Case Report – Main Gate
- Team D – Contracting for Safety
- Team D – Safe by Design (PDR/CDR)
- Team D – Audit
- Team D – Safety Case Report – In-Service
- Team D – Oil SSTS UOR
- Team D – Culture Assessment
- Team D – Maintaining ALARP In-service
- Team D – Oil SSTS Disposal
- Team E
- Team E – Safety Management Plan
- Team E – Preliminary Hazard Identification
- Team E – User Requirements Document
- Team E – Legislation Database
- Team E – SCR for Initial Gate
- Team E – System Requirements Document
- Team E – Oil SSTS ITEAP
- Team E – Safety Analysis of Options
- Team E – ALARP Assessment
- Team E – Safety Case Report – Main Gate
- Team E – Contracting for Safety
- Team E – Safe by Design (PDR/CDR)
- Team E – Audit
- Team E – Safety Case Report – In-Service
- Team E – Oil SSTS UOR
- Team E – Culture Assessment
- Team E – Maintaining ALARP In-service
- Team E – Oil SSTS Disposal
- Presentations
- Useful Info