| wdt_ID | ID | System Function / Component | Hazard Title / Description | Prelim - Accident Sequence | Required Controls / Mitigation |
|---|---|---|---|---|---|
| 399 | 1 | Well Head Oil Transfer | Overpressure: Over pressure of the well-head | Oil spill due to structure failure caused by Overpressure causes in well head | PRV. Pressure sensing. Over pressure shutoff manual/automatic |
| 404 | 2 | SSTS Isolating Valves | Flammable substances; e.g. solid, liquid or gaseous | Overpressure of pipe work, valve failure, control system failure, leaking flammable substances , risk of fire., environmental concerns. | Periodic inspection and maintenance. PRV, Pressure sensors. Automatic shutdown. Secondary isolations, fire detection and suppression |
| 405 | 3 | Transfer Pump | Mechanical Failure | Failure cause high temperature which leads to fire risk. | Inspection and maintenance. FD&F systems. |
| 406 | 4 | Oil Separator | Fire and Explosion Hazard | Flamable liquids and vapours come into contact with ignition source resulting gin fire and explosion. | Maintenance and inspection, PRV, Pressure sensors, Bunded tanks. FD&F system |
| 407 | 5 | Oil Separator | Control System Hazard | Instrumentation system, control logic or HMI error leading to hazardous substances leaks, Fire | Same as ID4 |
| 408 | 6 | Burn Off Gas | Fire & Explosion Hazard | Leaking gas from pipework, or accumulation of unburned gasses, comes into contact with an ignition source resulting in uncontrolled fire or explosion | Maintenance and inspection, metering, pressure sensors, PRV, FD&F, |
| 409 | 7 | Flame Tower | Mechanical/Structural Failure | Impact damage or corrosion causes and structural failure resulting in crushing, fatality, sympathetic damage to other systems | Maintenance, Inspection, PPE, controlled access zones. |
| 410 | 8 | Metering failure | Oil Spill | Inaccurate measuring of transferred liquid causing spillage and environmental contamination. | Maintenance, Inspection, Calibration, Pressure sensors, Remote cut-off. |
| 411 | 9 | Storage | Spillage | Spillage due to over filling, leaks or structural damage | PRV, Maintenance, Inspection, Sensors, Remote cut-off, Suitable materials |
| 412 | 10 | Flame Tower, Transfer System, Separator & Storage | Shock and Vibration | Excessive Shock and Vibration results in failure of critical system components, leading to leak of flammable gasses and liquids. |
- Home
- Workshops
- Scenario
- Team A
- Team A – Safety Management Plan
- Team A – Preliminary Hazard Identification
- Team A – User Requirements Document
- Team A – Legislation Database
- Team A – SCR for Initial Gate
- Team A – System Requirements Document
- Team A – Oil SSTS ITEAP
- Team A – Safety Analysis of Options
- Team A – ALARP Assessment
- Team A – Safety Case Report – Main Gate
- Team A – Contracting for Safety
- Team A – Safe by Design (PDR/CDR)
- Team A – Audit
- Team A – Safety Case Report – In-Service
- Team A – Oil SSTS UOR
- Team A – Culture Assessment
- Team A – Maintaining ALARP In-service
- Team A – Oil SSTS Disposal
- Team B
- Team B – Safety Management Plan
- Team B – Preliminary Hazard Identification
- Team B – User Requirements Document
- Team B – Legislation Database
- Team B – SCR for Initial Gate
- Team B – System Requirements Document
- Team B – Oil SSTS ITEAP
- Team B – Safety Analysis of Options
- Team B – ALARP Assessment
- Team B – Safety Case Report – Main Gate
- Team B – Contracting for Safety
- Team B – Safe by Design (PDR/CDR)
- Team B – Audit
- Team B – Safety Case Report – In-Service
- Team B – Oil SSTS UOR
- Team B – Culture Assessment
- Team B – Maintaining ALARP In-service
- Team B – Oil SSTS Disposal
- Team C
- Team C – Safety Management Plan
- Team C – Preliminary Hazard Identification
- Team C – User Requirements Document
- Team C – Legislation Database
- Team C – SCR for Initial Gate
- Team C – System Requirements Document
- Team C – Oil SSTS ITEAP
- Team C – Safety Analysis of Options
- Team C – ALARP Assessment
- Team C – Safety Case Report – Main Gate
- Team C – Contracting for Safety
- Team C – Safe by Design (PDR/CDR)
- Team C – Audit
- Team C – Safety Case Report – In-Service
- Team C – Oil SSTS UOR
- Team C – Culture Assessment
- Team C – Maintaining ALARP In-service
- Team C – Oil SSTS Disposal
- Team D
- Team D – Safety Management Plan
- Team D – Preliminary Hazard Identification
- Team D – User Requirements Document
- Team D – Legislation Database
- Team D – SCR for Initial Gate
- Team D – System Requirements Document
- Team D – Oil SSTS ITEAP
- Team D – Safety Analysis of Options
- Team D – ALARP Assessment
- Team D – Safety Case Report – Main Gate
- Team D – Contracting for Safety
- Team D – Safe by Design (PDR/CDR)
- Team D – Audit
- Team D – Safety Case Report – In-Service
- Team D – Oil SSTS UOR
- Team D – Culture Assessment
- Team D – Maintaining ALARP In-service
- Team D – Oil SSTS Disposal
- Team E
- Team E – Safety Management Plan
- Team E – Preliminary Hazard Identification
- Team E – User Requirements Document
- Team E – Legislation Database
- Team E – SCR for Initial Gate
- Team E – System Requirements Document
- Team E – Oil SSTS ITEAP
- Team E – Safety Analysis of Options
- Team E – ALARP Assessment
- Team E – Safety Case Report – Main Gate
- Team E – Contracting for Safety
- Team E – Safe by Design (PDR/CDR)
- Team E – Audit
- Team E – Safety Case Report – In-Service
- Team E – Oil SSTS UOR
- Team E – Culture Assessment
- Team E – Maintaining ALARP In-service
- Team E – Oil SSTS Disposal
- Presentations
- Useful Info