| 335 |
The flame tower requires a monitoring system when burning gas |
Factory acceptance testing |
Test against system requirements measure of performance e.g. sampling frequency |
Pass |
Manufacture |
Yes |
| 342 |
The system requires an isolation period of no longer than 10s at the wellhead and tanker |
Factory Acceptance test |
Test time to for valves to close to confirm it's less than 10s, does it match the data sheet |
Pass |
Manufacture, Demonstration |
Yes |
| 344 |
The system shall be safe to operate at all expected pressures (8bar) |
Factory Acceptance Test |
Test system across all working pressures when a part of whole system as well as on individual data sheets |
Pass |
Assessment, Concept, Manufacture, In-Service, Disposal, Demonstration |
Yes |
| 345 |
The system requires a Knock out drum that separates liquids from gases before they reach the flare stack. |
Factory Acceptance Test and Sea Acceptance Trial |
Test in factory for compliance and at sea to test for parts per million |
Pass |
Assessment, Concept, Manufacture, In-Service, Disposal, Demonstration |
Yes |
| 346 |
The system requires Noise levels emitted to comply with the Control of Noise at Work Regulations |
Sea Acceptance Trial and Simulation |
computer based modelling for components, sea trial for whole system |
Pass/Fail |
Assessment, Concept, Manufacture, In-Service, Disposal, Demonstration |
Yes |
| 347 |
The system requires the super structure to be coated in corrosive restant paint |
Factory Acceptance Test/ Through life monitoring |
Meets corrosive certification requirement XXX |
Pass/Fail |
Manufacture, In-Service |
No |