| wdt_ID | Legislation | Applicability |
|---|---|---|
| 79 | Animal By-Products (Enforcement) (England) Regulations | |
| 80 | Borehole Sites and Operations Regulations | |
| 115 | Offshore Installations (Prevention of Fire and Explosion, and Emergency Response) Regulations | |
| 116 | Offshore Installations and Wells (Design and Construction, etc.) Regulations | |
| 117 | Offshore Petroleum Activities (Oil Pollution Prevention and Control) Regulations | |
| 118 | Oil Storage Bund Legislation | |
| 119 | Ozone Depleting Substances Regulations | |
| 120 | Personal Protective Equipment at Work Regulations | |
| 121 | Pipelines Safety Regulations | |
| 122 | Planning (Hazardous Substances) Regulations | |
| 123 | Regulation (EC) concerning the Registration, Evaluation, Authorisation and Restriction of Chemicals (REACH) | |
| 124 | Regulation (EU) on ship recycling | |
| 125 | Reporting of Injuries, Diseases and Dangerous Occurrences Regulations | |
| 126 | Restriction of the Use of Certain Hazardous Substances in Electrical and Electronic Equipment Regulations | |
| 127 | Safe Use of Lifting Equipment - Approved Code of Practice | |
| 128 | Supply of Machinery (Safety) Regulations | |
| 129 | The Hazardous Waste (England and Wales) Regulations 2005 | |
| 130 | Work at Height Regulations | |
| 131 | Working Time Regulations | |
| 132 | Workplace (Health, Safety and Welfare) Regulations | |
| 133 | Pressurised Chemical Regulations | |
| 134 | Work at Sea Regulations | |
| 135 | US. Coast Guard Oil Platform Regulations | |
| 136 | Internal combustion machinery regulations | |
| 137 | HV Electrical pump regulations | |
| 138 | EU - Code of practice for control systems | |
| 139 | EU - Solid Waste Flow Measurement Directives | |
| 140 | UK - Lubrications and Greases Directive | |
| 141 | EU - Pnemautic Pressure Regulations | |
| 142 | Uganda - Offshore Oil Separation, Storage and Transfer System regulations | |
| 143 | IEC - Electrical Installation Standards - Domestic Dwellings | |
| 174 | ||
| 180 | ||
| 181 |
- Home
- Workshops
- Scenario
- Team A
- Team A – Safety Management Plan
- Team A – Preliminary Hazard Identification
- Team A – User Requirements Document
- Team A – Legislation Database
- Team A – SCR for Initial Gate
- Team A – System Requirements Document
- Team A – Oil SSTS ITEAP
- Team A – Safety Analysis of Options
- Team A – ALARP Assessment
- Team A – Safety Case Report – Main Gate
- Team A – Contracting for Safety
- Team A – Safe by Design (PDR/CDR)
- Team A – Audit
- Team A – Safety Case Report – In-Service
- Team A – Oil SSTS UOR
- Team A – Culture Assessment
- Team A – Maintaining ALARP In-service
- Team A – Oil SSTS Disposal
- Team B
- Team B – Safety Management Plan
- Team B – Preliminary Hazard Identification
- Team B – User Requirements Document
- Team B – Legislation Database
- Team B – SCR for Initial Gate
- Team B – System Requirements Document
- Team B – Oil SSTS ITEAP
- Team B – Safety Analysis of Options
- Team B – ALARP Assessment
- Team B – Safety Case Report – Main Gate
- Team B – Contracting for Safety
- Team B – Safe by Design (PDR/CDR)
- Team B – Audit
- Team B – Safety Case Report – In-Service
- Team B – Oil SSTS UOR
- Team B – Culture Assessment
- Team B – Maintaining ALARP In-service
- Team B – Oil SSTS Disposal
- Team C
- Team C – Safety Management Plan
- Team C – Preliminary Hazard Identification
- Team C – User Requirements Document
- Team C – Legislation Database
- Team C – SCR for Initial Gate
- Team C – System Requirements Document
- Team C – Oil SSTS ITEAP
- Team C – Safety Analysis of Options
- Team C – ALARP Assessment
- Team C – Safety Case Report – Main Gate
- Team C – Contracting for Safety
- Team C – Safe by Design (PDR/CDR)
- Team C – Audit
- Team C – Safety Case Report – In-Service
- Team C – Oil SSTS UOR
- Team C – Culture Assessment
- Team C – Maintaining ALARP In-service
- Team C – Oil SSTS Disposal
- Team D
- Team D – Safety Management Plan
- Team D – Preliminary Hazard Identification
- Team D – User Requirements Document
- Team D – Legislation Database
- Team D – SCR for Initial Gate
- Team D – System Requirements Document
- Team D – Oil SSTS ITEAP
- Team D – Safety Analysis of Options
- Team D – ALARP Assessment
- Team D – Safety Case Report – Main Gate
- Team D – Contracting for Safety
- Team D – Safe by Design (PDR/CDR)
- Team D – Audit
- Team D – Safety Case Report – In-Service
- Team D – Oil SSTS UOR
- Team D – Culture Assessment
- Team D – Maintaining ALARP In-service
- Team D – Oil SSTS Disposal
- Team E
- Team E – Safety Management Plan
- Team E – Preliminary Hazard Identification
- Team E – User Requirements Document
- Team E – Legislation Database
- Team E – SCR for Initial Gate
- Team E – System Requirements Document
- Team E – Oil SSTS ITEAP
- Team E – Safety Analysis of Options
- Team E – ALARP Assessment
- Team E – Safety Case Report – Main Gate
- Team E – Contracting for Safety
- Team E – Safe by Design (PDR/CDR)
- Team E – Audit
- Team E – Safety Case Report – In-Service
- Team E – Oil SSTS UOR
- Team E – Culture Assessment
- Team E – Maintaining ALARP In-service
- Team E – Oil SSTS Disposal
- Presentations
- Useful Info
