| wdt_ID | URD ID | User Requirement | Type of URD (Safety/Performance) | Safety Thresholds / Targets | Rationale for Requirement |
|---|---|---|---|---|---|
| 383 | 1 | The User requires the Oil SSTS to be able to receive crude oil from the extraction point of the rig, at pressures up to 20bar | Safety & Performance | Oil SSTS system to be able to withstand high pressures. | To prevent the spillage of flammable hydrocarbon liquids and gasses. Maximise revenue again. Verified by inspection, design and performance metrics. |
| 391 | 2 | The User requires the ability to readily isolate the well head within 10 seconds | Safety | to be able to isolate the oil transfer system | To limit propagation and damage caused by SSTS failure. Verify with design and test/inspection. Carry out regular system health checks. |
| 392 | 3 | The User requires the Oil Rig to be able to operate in all weather conditions prevalent to the location | Performance & Safety | 24/7 operations; Ability to with stand environmental extremes | Maximisation of SSTS systems to provide oil for revenue; prevent structural failure and environmental contamination. Verify with calculation or design and test/inspection of damage and corrosion. |
| 393 | 4 | The User requires the Oil SSTS to comply with the Control of Noise at Work Regulations | Safety | Not exceed noise limits as defined by regulations | To minimize risk of hearing damage to employees and reduce the risk of communications failure and being sued. Test and inspection of all relevant machinery and issue appropriate PPE. |
| 394 | 5 | The User requires the Oil SSTS to comply with HSE Legislation | Safety | All aspects of HSE legislation complied with and monitored | Legal compliance and not being sued. Verify via audits and analysis. |
| 395 | 6 | The User requires the platform to be capable of detecting fires, smoke and heat concentrations in all modules and on the open deck and initiating an alarm | Safety | detect any heat sources before fire or damage caused to safety critical equipment | In order to detect and supress fires at the earliest opportunity to minimize the risk of a fire spreading and reduce the risk of injury /death. Carry out regular inspections and tests, verified via design and performance. |
| 396 | 7 | The User requires the Oil SSTS to meet the relevant safety thresholds in Defence Safety Policy | Safety | To meet all relevant thresholds in the DSA01 | Legislative compliance. verified via audits. |
| 398 | 8 | The User requires the Oil SSTS to comply with the Control of Pollution (Oil Storage Regulations) | Safety | No oil to be released into the sea or into oil rig life support systems (water supply, vent) | Legal compliance, Protect the environment and public health by minimizing accidental leaks or spills. verified via audits, inspections and tests. |
| 399 | 9 | The User requires the number of personnel to operate the system to be minimised | Safety and performance | To maximise to number of systems to be automated | To improve safety to minimise human error and system operating efficiency. To reduce the wage bill |
| 401 | 11 | All risks shall be reduced to at least Tolerable Levels that are ALARP | Safety |
- Home
- Workshops
- Scenario
- Team A
- Team A – Safety Management Plan
- Team A – Preliminary Hazard Identification
- Team A – User Requirements Document
- Team A – Legislation Database
- Team A – SCR for Initial Gate
- Team A – System Requirements Document
- Team A – Oil SSTS ITEAP
- Team A – Safety Analysis of Options
- Team A – ALARP Assessment
- Team A – Safety Case Report – Main Gate
- Team A – Contracting for Safety
- Team A – Safe by Design (PDR/CDR)
- Team A – Audit
- Team A – Safety Case Report – In-Service
- Team A – Oil SSTS UOR
- Team A – Culture Assessment
- Team A – Maintaining ALARP In-service
- Team A – Oil SSTS Disposal
- Team B
- Team B – Safety Management Plan
- Team B – Preliminary Hazard Identification
- Team B – User Requirements Document
- Team B – Legislation Database
- Team B – SCR for Initial Gate
- Team B – System Requirements Document
- Team B – Oil SSTS ITEAP
- Team B – Safety Analysis of Options
- Team B – ALARP Assessment
- Team B – Safety Case Report – Main Gate
- Team B – Contracting for Safety
- Team B – Safe by Design (PDR/CDR)
- Team B – Audit
- Team B – Safety Case Report – In-Service
- Team B – Oil SSTS UOR
- Team B – Culture Assessment
- Team B – Maintaining ALARP In-service
- Team B – Oil SSTS Disposal
- Team C
- Team C – Safety Management Plan
- Team C – Preliminary Hazard Identification
- Team C – User Requirements Document
- Team C – Legislation Database
- Team C – SCR for Initial Gate
- Team C – System Requirements Document
- Team C – Oil SSTS ITEAP
- Team C – Safety Analysis of Options
- Team C – ALARP Assessment
- Team C – Safety Case Report – Main Gate
- Team C – Contracting for Safety
- Team C – Safe by Design (PDR/CDR)
- Team C – Audit
- Team C – Safety Case Report – In-Service
- Team C – Oil SSTS UOR
- Team C – Culture Assessment
- Team C – Maintaining ALARP In-service
- Team C – Oil SSTS Disposal
- Team D
- Team D – Safety Management Plan
- Team D – Preliminary Hazard Identification
- Team D – User Requirements Document
- Team D – Legislation Database
- Team D – SCR for Initial Gate
- Team D – System Requirements Document
- Team D – Oil SSTS ITEAP
- Team D – Safety Analysis of Options
- Team D – ALARP Assessment
- Team D – Safety Case Report – Main Gate
- Team D – Contracting for Safety
- Team D – Safe by Design (PDR/CDR)
- Team D – Audit
- Team D – Safety Case Report – In-Service
- Team D – Oil SSTS UOR
- Team D – Culture Assessment
- Team D – Maintaining ALARP In-service
- Team D – Oil SSTS Disposal
- Team E
- Team E – Safety Management Plan
- Team E – Preliminary Hazard Identification
- Team E – User Requirements Document
- Team E – Legislation Database
- Team E – SCR for Initial Gate
- Team E – System Requirements Document
- Team E – Oil SSTS ITEAP
- Team E – Safety Analysis of Options
- Team E – ALARP Assessment
- Team E – Safety Case Report – Main Gate
- Team E – Contracting for Safety
- Team E – Safe by Design (PDR/CDR)
- Team E – Audit
- Team E – Safety Case Report – In-Service
- Team E – Oil SSTS UOR
- Team E – Culture Assessment
- Team E – Maintaining ALARP In-service
- Team E – Oil SSTS Disposal
- Presentations
- Useful Info